| NODE | RECONNECTION |
|---|---|
| NODE | RECONNECTION |
| CSW - CENTRALIZED SCHEDULE WASTE STORAGE | 7 |
| DPR - DOCK PUMP ROOM | 5 |
| L38 - LOCAL SUB-STATION NO.38 | 5 |
| W43 - WORKSHOP 43 | 4 |
| L12 - LOCAL SUB-STATION NO.12 | 4 |
| W19 - PIPE SPOOL, STEEL MATERIAL & CNC WORKSHOP | 2 |
| 132KV - 132kV MAIN SUB STATION | 1 |
| W41 - EXOTIC PIPING WORKSHOP | 1 |
| W11 - IETS - CHEMICAL CLEANING WORKSHOP | 1 |
| L42 - LOCAL SUB-STATION NO.42 | 1 |